| PROJECT DEVELOPMENT AND CONSULTANCY |
|---|
| Site Visit and Technical Data Verification Across Peninsular for SEDA 2016 FiT Individual Quota 4kWp, 8kWp and 12kWp |
| TNB Advanced CCC for 425kWp Ground-Mount Solar Farm, Kelantan |
| LSS1 PSS STUDY 850kWp kelantan Ground-Mount Solar Farm |
| LSS1 PSS STUDY 15MWp Kelantan – Ground-Mount Solar Farm Kelantan |
|
LSS2 PSS STUDY 9.9MWp Johor – Carport Solar Farm |
|
LSS2 PSS STUDY 9.9MWp Kelantan – Ground-Mount Solar Farm |
| SUB-CONTRACTING WORKS |
|---|
| Off-Grid 200kWp Sabah PV Hybrid System – UG Cabling & Remedial Works |
| Off-Grid 4kWp Sarawak PV Hybrid System – Installation, T&C |
| NEM 5.3kWp Kuala Lumpur Grid-Connected System – Installation, T&C |
| Off-Grid 650kWp Sarawak PV Hybrid System – Battery Installation |
| NEM 5kWp Grid-Connected System – Installation, T&C |
| LSS2 30MWp Perak Grid-Connected System – Equipment & Manpower Supply |
| C&I 164kWp Kajang Grid-Connected System – Installation, T&C |
| C&I 945kWp Kapar Grid Connected System – Installation, T&C |
| OPERATION AND MAINTENANCE SERVICES |
|---|
| 172kWp Roof-Retrofit Grid-Connected System, Melaka |
| 425kWp Building Integrated (BIPV) Grid-Connected System, Pulau Pinang |
| 122.4kWp Self-Consumption System with 3.0kWp Wind Turbine, Cyberjaya |